Summer Construction Update
MCWD staff and contractors have started on the 2025 summer construction project schedule.
In Progress:
Phase two of the District’s campus paving and drainage rehabilitation. This will improve site infrastructure.
Coming Soon:
- Water holding tanks, T-7 and the Lake Mary backwash tank will be recoated and rehabilitated. This will significantly extend the life of these valuable facilities.
- New monitoring wells will be constructed at Laurel Pond, where treated wastewater is discharged.
- A potable water pipeline will be installed to add redundancy to the water distribution system for a portion of town.
- Some additional fire hydrants will be installed around the wildland urban interface.
For more information please contact David Carlson @ 760-934-2596 x296